Installation Guide

 


HYDRAGUARD is designed to work in conjunction with a base plate and a P/N 4.5 light walled 225mm PVC storm water pipe.

HYDRAGUARD will center the hydrant in the well but only the bottom plate stops the 225mm storm water well pipe.

PLEASE ALLOW A MINUMUM OF 100mm BETWEEN BASE PLATE AND HYDRAGUARD to allow a stiff fit with the shroud assisting with backfilling.


1. First Gasket
Place an 80mm gasket on the 80mm hydrant flange.
(As you would normally do, round or square gaskets. It makes no difference)




2. HYDRAGUARD on top


3. Second Gasket


The 80mm spring hydrant IS PLACED IMMEDIATELY ON TOP and the M16x75 stainless steel bolts are inserted.

HYDRAGUARD is meant to BE PLACED IMMEDIATELY UNDER THE SPRING HYDRANT for ease of future maintenance.

HYDRAGUARD has A SPECIAL SEALING NOTCH INSIDE THE BOLT HOLES which may require the bolts to have a
"light tap" with a hammer to go through the hole. This is normal.



The longer M16x75mm stainless steel hydrant bolts are required for HYDRAGUARD installation.
THESE ARE SUPPLIED WITH THE KIT.
This is to get the unthreaded bolt shank all the way through the HYDRAGUARD plate bolt holes to make a seal with the inner notch. If the usual 50mm hydrant bolt is used, the bolt thread can be used as a pathway by the ants. The M16x75mm S/S bolts can be inserted either up or down through the plate.
CORRECT: M16x75mm Stainless
INCORRECT: M16x50mm Stainless



THE SN1- P/N 4.5  Thin wall 225mm PVC STORMWATER PIPE is installed down over the HYDRAGUARD plate and into the base plate.

You will need some pipe lubricant to ease the 225mm PVC pipe over the HYDRAGUARD sealing ring. Angling the pipe slightly to one side as you push it gently over the rubber ring - helps to east it on.

BE CAREFUL NOT TO ROLL THE SEALING RING out of its locating slot when pushing the 225mm on. If this occurs try again
with more pipe lubricant.

Make sure to keep the PVC pipe 90 degrees to the HYDRAGUARD plate, essential for a seal with the outer rubber sealing ring.

KEEP SPOIL OUT OF INSTALLATION TO STOP CAPILLARY PLUGS FROM BEING BLOCKED.


Finish off with a hydrant box and lid. Note that HYDRAGUARD has centred the hydrant in the well. Try to avoid getting dirt in during installation.